Partner in Development

Our Services

GEC offers comprehensive development studies, pre-feasibility study, feasibility study, detailed engineering design and evaluation, pre-construction services (which include rapid and full blown environmental impact assessment studies), construction supervision, construction management, control and commissioning, advisory services to government units, property developers, and industries particularly to mining and manufacturing companies with intensive waste management needs.

The company also conducts environmental impact assessments and prepares corresponding environmental impact statements and facilitates in processing of environmental compliance certificate (ECC) or certificate of non-coverage, prepares permit and self-monitoring report, develops pollution prevention, solid waste management, and hazardous waste management, project safety, traffic, environmental monitoring plans, prepares Engineering Geologic and Geohazard Assessment Report (EGGAR), conducts geohazard mapping and hydrological study, prepares risk assessment and disaster management, prepares engineering designs, develops comprehensive land use plan, prepares coastal management zoning...(Show More)

RECENT BLOGS

ON-GOING PROJECTS

Diwalwal Gold Mining Project

railway

Mineral Reservations are established by the President of the Philippines when the national interest so requires, upon the recommendation of the Director of the Mines and Geosciences Bureau (MGB)...

Samal Island - Davao City Connector

railway

The SIDC Project is aimed at providing infrastructure solution to the long travel time and limited accessibility between Davao City and the Island Garden City of Samal. (RDC)-Davao recently endorsed the DPWH recommendation to construct an extradosed bridge.

Mindanao Railway Phase 1

railway

The MRP-TDD is expected to not only make travel faster, but also safer, more convenient and comfortable for passengers in the said corridor. It will have 8 stations, namely: Tagum; Carmen; Panabo; Mudiang; Davao Terminal; Toril; Sta. Cruz; and Digos. A 10-hectare depot in Tagum.

Mindanao Railway Phase 1

railway

DAVAO CITY” Construction of the first phase of the Multi-billion Mindanao Railway Project, which covers the Tagum-Davao-Digos segment.

Wire Rod Processing Plant

railway

The wire rod processing plant is a new manufacturing and forming plant project. The project involves construction and operation of wire rod manufacturing plant.

JS Gaisano Mall

railway

The proposed commercial building will be located in 17,745 square meters lot owned by J. Nissi Chevra Inc. at Quezon Boulevard, Brgy. Poblacion Kidapawan City.

Tayud Building and Repair Project

railway

Tayud Building and Repair Project Site is located at Sitio Baha-baha, Brgy. Tayud, Municipality of Consolation Cebu - Philippines. It will serve as a shipyard facility for those aging ships and fleets that need to be repaired and maintained, replaced and built new ones.

Caraga Hydro-electric Power Plant

railway

Hydro-electric power plants are usually located in dams that impound rivers, thereby raising the level of the water behind the dam and creating as high a head as is feasible. The structure that houses the turbines and generators, and into which the pipes or penstocks feed, is called the powerhouse.

Hydrolic Analysis Camella homes

railway

Camella maintains five pillars in its housing projects that enable the company to keep its leadership position in the housing industry. Camella residential projects have the following pillars: excellent location, convenience, safety and security, wise investment, affordability and value for money.

GalerioEnvi

Social Links