Listed below are the past projects and experiences of the GEC Environmental Consultancy through the projects and experiences of its consultants:

On-going Projects

Flooding and hydrologic Study

  1. Flooding and hydrologic Study., BRIA Homes, Cagayan De Oro City
  2. 10 hectares land development of Camella Homes, Biao Eskwela, Tugbok, Davao City
  3. 8 hectares land development of Camella Homes, Katanggawan, General Santos City
  4. Flooding and hydrologic Study., BRIA Homes, General Santos City
  5. Flooding and hydrologic Study., Camella Homes, Butuan City
  6. Flooding and hydrologic Study., Camella Homes, Cagayan De Oro City

Environmental Impact Assessment Study

  1. Diwalwal Gold Mining Project
  2. Samal Island - Davao City Connector Project
  3. 102 km Phase 1 Tagum-Digos-Davao Mindanao Railway Project
  4. Shipyard Project of Tayud Shipworks Inc., Brgy. Tayud, Consolacion, Cebu
  5. JS Gaisano Mall Project, J. Nissi Chevra, Inc, Brgy. Poblacion, Kidapawan City
  6. Caraga A1 Hydro-electric Power Plant. Caraga, Davao Oriental
  7. Caraga A2 Hydro-electric Power Plant. Caraga, Davao Oriental
  8. Caraga A3 Hydro-electric Power Plant. Caraga, Davao Oriental
  9. Davao Steel Master Manufacturing and Forming Inc., Bunawan, Davao City
  10. Environmental Performance Report and Management Plan., Uraya Memorial Gardens, Butuan City

Completed Projects

  • Geohazard Study

    Geohazard

    Toledo, Cebu

    Geohazard Assessment Study of Magdugo Substation Project of MERALCO INDUSTRIAL ENGINEERING SERVICES CORPORATION, Toledo, Cebu

  • Geotechnical Investigation Project

    Geotechnical Investigation

    Cabadbaran City, Agusan del Norte

    Geotechnical and geohazard mapping of 12.0MW Cabadbaran Hydro-electric power plant, Cabadbaran City, Agusan del Norte

  • Detailed Engineering Design Services

    Detailed Engineering
    Design Services

    Brgy. Lumbia, Cagayan De Oro City

    4.2927 hectares detailed engineering design services for socialized housing development of Pueblo de Oro Development Corporation, Brgy. Lumbia, Cagayan De Oro City

  • Compliance Monitoring and construction monitoring

    Compliance Monitoring and
    construction monitoring

    Kalayaan, Laguna

    Water quality and aquatic ecology study of Laguna and Caliraya Lake, CBK Power Company Limited, Kalayaan, Laguna

  • Flooding and hydrologic Study

    Flooding and hydrologic Study

    Philippines
    • 20 hectares land development of Bria Homes, Bogo, Cebu
    • 23 hectares land development of Camella, Ula, Tugbok, Davao City
    • 21.3969 hectares land development of Bria Homes, Inc, San Isidro, General Santos City
    • 26.5048 hectares land development of Bria Homes, Inc, Brgy. Mailag, Valencia, Bukidnon
    • 29 hectares land development of Bria Homes, Inc., Calinan, Davao City
    • 14 hectares land development of Camella, Calinan, Davao City
    • 1.8 hectares land development of Camella, Maa, Davao City
    • 1.9 hectares land development of Camella, Tigatto, Buhangin, Davao City
    • 17 hectares land development of Camella, Valencia City, Bukidnon
    • 10 hectares land development of Bria Homes, Inc., Balingasag, Misamis Orriental
    • 20.7 hectares land development of Bria Homes, Inc., Cagayan de Oro City
    • 17 hectares land development of Bria Homes, Inc., Tagum City
    • 13.5 hectares land development of Bria Homes, Inc., Digos City
    • 10 hectares land development of Camella, Koronadal City
    • 42.5 hectares land development of Camella, Brgy. Bato, Toril, Davao City
    • 30 hectares land development of Camella, Brgy. Communal, Davao City
    • 11 hectares land development of Camella, Brgy. Tiguma, Pagadian City
    • 14 hectares land development of Camella, Brgy. Tiguma, Pagadian City
    • 1.3 hectares land development of Camella, Buhangin, Davao City
    • 51.2 hectares land development of Camella, Brgy. Catalunan Grande, Davao City
    • 10 hectares land development of Pueblo de Oro, Brgy. Lumbia, Cagayan de Oro City
    • 11 hectares land development of Camella, Brgy. Catalunan Grande, Davao City
    • 22 hectares land development of Sta. Lucia Land Inc., Brgy. Mandug, Davao City
    • 98.5 hectares, Leisure Farm Tourism Project of Sta. Lucia Land, Inc.
    • 10 hectares, residential project of Camella, Lumbia, Cagayan de Oro City
    • 10 hectares, residential project of Camella, Luna, Surigao City
    • 10 hectares, residential project of Camella, Rizal, Suriago City
    • 43 hectares, residential project of Camella, Libertad, Butuan City
    • 37 hectares, residential project of Camella, Ampayon, Butuan City
    • 1 hectare, medium rise residential project of Camella, Kauswagan, Cagayan de Oro City
    • 80 hectares, residential project of Camella, Opol, Misamis Oriental
    • 3 hectares, medium rise commercial/residential building of Camella Land, Lanang, Davao City
    • 20.3 hectares, residential project of Camella, Opol, Misamis Oriental
    • 19.5 hectares, residential project of Camella, Tagum City
    • 5.3191 hectares, residential project of Camella, Lumbia, Cagayan de Oro City
  • Traffic Impact Assessment Study

    Traffic Impact Assessment
    Study

    Philippines
    • Traffic Impact Assessment for Las Colinas Leisure Farm Tourism Project of Sta. Lucia Land, Inc. – Brgy. Eden, Toril, Davao City
    • Traffic Impact Assessment for Centropolis Subdivision Project of Sta. Lucia Land, Inc. – Brgy. Communal, Davao City
    • Traffic Impact Assessment for Altea Ciudades Project of Sta. Lucia Land, Inc. – Brgy. Mandug, Davao City
    • Traffic Impact Assessment for Valle Verde Residential Estate Project of Sta. Lucia Land, Inc. – Brgy. Panacan, Davao City
    • Traffic Impact Assessment for Camella Condominium Project – Katipunan, Quezon City
    • Traffic Impact Assessment for Camella Condominium Project – Vito Cruz, Manila
    • Traffic Impact Assessment for Camella Glenmont Place – Sauyo, Quezon City
    • Traffic Impact Assessment for Camella Pine Suites – Tagaytay City
    • Traffic Impact Assessment for Vista Residence Inc. – Legarda, Manila
    • Traffic Impact Assessment for Vista Residence – Taft Avenue, Manila
    • Traffic Impact Assessment for Liwayway Office Building – Libertad, Pasay City
    • Traffic Impact Assessment for SM Mall Tuguegarao City
  • Engineering Geologic Geohazard Assessment (EGGAR)

    EGGAR Project

    Philippines
    • Phase 2 expansion Project of Valle Verde Residential Estate of Sta. Lucia Land Inc.-Brgy. Panacan, Davao City
    • 22 hectares land development project of Sta. Lucia Land, Inc, Brgy. Mandug, Davao City
    • Phase 2, 3 and 4 expansion Project of Ponte Verde of Sta. Lucia Land, Inc., Brgy. Communal Davao City
    • 98.5 hectares Leisure Farm Tourism Project of Sta. Lucia Land, Inc.
    • Detailed geohazard assessment of Agusan del Sur Electric Cooperative, Inc. Power Plant
    • Geological and Geohazard investigation of Lake Sebu Mini-hydropower Plant
    • Geological and Geohazard investigation of New Bataan Mini-hydropower Plant
    • Geological and Geohazard investigation of Bayug Mini-hydropower Plant
    • Geological and Geohazard investigation of Alamada Mini-hydropower Plant
    • Geological and Geohazard investigation of Sawaga Mini-hydropower Plant
  • Environmental Impact Assessment

    Environmental Impact
    Assessment

    Philippines
    • 8.8698 hectares tourism project of Philswiss United Holding Corporation, Brgy. Okoy, Bantayan Island, Cebu
    • 7.7 hectares expansion project of Sta. Lucia Lands, Buhangin, Davao City
    • 4.9 hectares expansion project of Sta. Lucia Lands, Panacan, Davao City
    • 8 hectares land development of Sta. Lucia Lands, Mandug, Davao City
    • Environmental Impact Assessment of 17 hectares Commercial and Residential Resort, Uraya Land Development Inc. Adecor, Island Garden City of Samal
    • Environmental Impact Assessment of 98.5 hectares land development for Leisure Farm Tourism Project of Sta. Lucia Land Inc. located at Eden, Toril
    • Environmental Performance Report and Management Plan, 5.2 MW modular genset expansion project, Peakpower San Francisco Inc, San Francisco, Agusan del Sur
    • Environmental Impact Statement (EIS) Report, 10.4 MW modular genset, Peakpower Bukidnon Inc., Manolo Fortich, Bukidnon
    • EIA Component of Feasibility Study for the Davao Coastline and Port Development Project (DCPDP), Davao City, (November 2014)
    • Reviewed the draft Initial Environmental Examination (IEE) of the ADB Project on Hatxan to Pleiku Power Transmission Project, Lao PDR to Vietnam under Technical Assistance (TA)-6440 (REG): Facilitating Regional Power Trading and Environmentally Sustainable Development and Electricity Infrastructure in the Greater Mekong Subregion. (April-June 2012)
    • October 2014, Initial Environmental Examination Report, Lanang Business Park, Lanang, Davao City
  • Initial Environmental Examination Report

    Initial Environmental
    Examination Report

    Davao City

    Warehouse Building of Dominic and Sons Realty and Development, Inc., Davao City

  • Environmental Performance Report and Management Plan

    Environmental Performance
    Report and
    Management Plan

    Toril, Davao City

    Phase 6 expansion and modification of Phase 1 of Villa de Mercedez (93 heactares), Toril, Davao City (ECC-R11-1401-014)

  • Initial Environmental Impact Assessment Report

    Initial Environmental
    Impact Assessment
    Report

    Ganassi, Lanao del Sur

    4km farm-to-market road, Ganassi, Lanao del Sur

  • Initial Environmental Examination Report

    Initial Environmental
    Examination Report

    Ganassi, Lanao del Sur

    Barit Water System, Ganassi, Lanao del Sur

  • Initial Environmental Examination Report

    Initial Environmental
    Examination Report

    Digos, Davao del Sur

    Earthfill Quarry, Digos, Davao del Sur

  • Initial Environmental Examination Report

    Initial Environmental
    Examination Report

    Catalunan Grande, Davao City

    39.9132 hectares Subdivision and commercial resort, Uraya Land Development Inc., Catalunan Grande, Davao City

  • Initial Environmental Examination Report

    Initial Environmental
    Examination Report

    Sasa, Davao City

    Ferry Terminal, Kudos Trucking Corporation, Km.12, Sasa, Davao City

  • Initial Environmental Examination Report

    Initial Environmental
    Examination Report

    Matanao, Davao del Sur

    OZ Whisphil Inc. (Banana Plantation and Packing Plant), Matanao, Davao del Sur

  • Initial Environmental Examination Report

    Initial Environmental
    Examination Report

    Catalunan Grande, Davao City

    Uraya Land Development Inc. (Elenita Heigts Subdivision Phase 4), Catalunan Grande, Davao City

  • Environmental Impact Statement Report

    Environmental Impact
    Statement Report

    Davao City

    SMI Development Corporation (Mega Asia Bottling Corporation), Davao City. (Zest-O and RC Cola Bottling Plant)

  • Initial Environmental Examination Report

    Initial Environmental
    Examination Report

    Sta. Lucia Realty and Development Inc.

    • Colinas Verdes Subdivision, General Santos City
    • Valle Verde Subdivision, Davao City
    • Ponte Verde Subdivision, Davao City
  • Initial Environmental Examination Report

    Initial Environmental
    Examination Report

    Armed Forces and Police Mutual Benefit Association

Feasibility Study (Completed Projects)

  • Asian Development Bank Funded-ARCP II Projects

    Asian Development Bank
    Funded-ARCP II Projects

    Philippines
    • 1 unit post harvest facility located at Brgy. Barit, 1 unit health center located at Brgy. Camporangaya and 4 unit multi-purpose buildings located at Brgys. Taliogan, Barorao, Taganonok and Tabuan, Ganassi, Lanao del Sur
    • 4.6km farm-to-market road located at Taganonok-Masulon-Taliogan, Ganasi, Lanano del Sur
    • 4km farm-to-market road located at Brgys. Camporangaya, Masulon, and Taliogon, Ganassi, Lanao del Sur
    • 2 units day care center located at Brgys. Gadongan and Lumba Ingud and 1 unit multi-purpose building with solar dryer located at Brgy. Pantao, Poona Bayabao, Lanao del Sur
    • 3 units school buildings located at Brgys. Camporangaya, Barorao, Panggawalupa, Taliogon, Taganonok, Tabuan and Masulon, Ganassi, Lanao del Sur
  • Feasiblity Study

    Feasiblity Study

    Davao City

    roposed 5-storey commercial building of Armed Forces and Police Mutual Benefit Association, Inc., Davao City

  • Feasiblity Study

    Feasiblity Study

    General Santos City

    Sta. Lucia Realty and Development, Inc. (Colinas Verdes Subdivision, General Santos City)

Resettlement Action Plan Project

Prepared and Implemented the Resettlement Action Plans (RAP) based on ADB RAP Guidelines and as such does the following for the following Thermal Power Plant and High Voltage Electric Transmission Line Projects:

  1. Identification of the Project-Affected-Persons (PAFs) within the Right-of-Way (ROW) for high voltage electric transmission line projects;
  2. Identification of damages to properties;
  3. Consultations with the concerned PAFs, NGOs and community hosts or Barangay Officials;
  4. Socioeconomic data gathering;
  5. Classification of PAFs as to type of damages, eligibility and entitlement criteria and socioeconomic characteristics;
  6. Social planning and income restoration by development of compensation options and livelihood programs for the PAFs by considering fairness and long term sustainability;
  7. Identification of the Relocations sites;
  8. Conduct of environmental impact assessment (EIA) for the relocation sites;
  9. Establishment of resettlement group who will implement the RAP for PAFs, this included staffing and budgeting, staff training and capacity building, and by considering NGOs as resettlement implementation agents; and
  10. RAP internal monitoring, review and evaluation, this include identification of monitoring indicators.

Thermal Power Plant and High Voltage Electric Transmission Line Projects

  1. 2 x 300 MW Masinloc Coal-Fired Thermal Power Project, Masinloc, Zambales, 1998-2002;
  2. 230 kV Masinloc-Labrador Transmission Line Project (1998-2002);
  3. Transmission Grid Reinforcement Project which include the following components (2000-2005):
    a) 225 km 500 ad 230 kV Labrador to San Manuel and San Jose Electric Transmission Line (T/L) Project
    b) b. 230 kV Labrador-Sual T/L Project
    c) Eight (8) 230/69 kV reinforcement substations (S/Ss) for Central Luzon subtransmission networks

Environmental Trainings, Seminars and Workshops Conducted

  • Environmental Impact Assessment, UAP-EnP Quezon City Chapter, October 2013
  • Environmental Laws and Environmental Management, PICE Annual Seminar, August 2012
  • Drafting and formulation of environmental code of Island Garden City of Samal, November 2012
  • Resource Person on Environmental Laws and Regulations applicable to the operation of National Grid Corporation of the Philippines (NGCP)
    NGCP Environmental Officers’ Summit, 2010
  • Resource Person on Environmental Laws and Regulations applicable to the operation of National Transmission Corporation (TransCo)
    Semi Annual TransCo Environmental Officers’ Summits, 2004-2009
  • Basic SCUBA Diving-Refresher Course for National Transmission Corporation, October 13-14, 2008;
  • TransCo Series of Seminar-Workshops on Environmental Matters and PCB Waste Management, 2004;
  • Integration of Sustainable Development Principles in Environmental Engineering/Science/Management Undergraduate Course
    University of San Carlos, CebuCity, January 18, 2003
    A Project of Mapua Institute of Technology in cooperation with University of South Carolina and The Philippine Association for Technological Education, Inc. sponsored by USAID;
  • Seminar-Workshop on Sustainable Development and Pollution Control (Trainor’s Training) Manila Diamond Hotel, May 30-31, 2001
    An Activity under the Project of Mapua Institute of Technology entitled Integration of Sustainable Development Principles in Environmental Engineering/Science/Management Undergraduate Course in cooperation with University of South Carolina and sponsored by USAID;
  • Environmental Seminar: Environmental Impact Assessment
    Mapua Institute of Technology
    February 25, 1998

There may be other engineering and environmental management capabilities GEC has by virtue of the experiences of its consultants not mentioned here. For specific queries about GEC’s other engineering and environmental management capabilities, kindly inquire with Ms. Leonila P. Galerio.